AEC 226 Construction Scheduling

3 Credit Hours • 52.5 Contact Hours (30 Lecture, 22.5 Lecture/Lab Combination)

Prerequisite: AEC 107, AEC 216, AEC 121 or CAR 104

Students will research various methods of project scheduling. Emphasis will be placed on critical path method techniques and strategies.